Comprehensive maintenance of A1 Motorway, section Toruń Południe – Kutno Północ.

< Back to Projects

Discipline: Operation & Maintenance
Sector: Public Infrastructure (Motorways)
Client: State Treasury of Poland represented by GDDKiA, Bydgoszcz branch office
Duration: 6 years (2016-2022)
Status: ongoing
Technical Details:

  • 92 km of dual carriageway motorway, bituminous pavement
  • 5 interchanges,
  • 1 OMC center
  • 8 rest areas (MOPs)

Comprehensive maintenance, which includes:

  • 24h/day Road patrolling and reporting to the Client;
  • on-call interventions on the road;
  • 24h/day dispatchers service;
  • Comprehensive winter maintenance activities (snow removal, de-icing, etc.);
  • Comprehensive summer maintenance activities, including:
    • Grass mowing, Trimming of the trees and bushes,
    • Cleaning of bridges;
    • Cleaning of the stormwater drain installations – pipes, culverts, ditches, ecological basins, etc.
    • Cleaning of the horizontal traffic signs on the road,
    • Wet and dry cleaning of the barriers, road signs, etc.
    • Garbage removal,
  • Repair of pavement damages;
  • Crack sealing and concrete pavement structure expansion joins replacement;
  • Renewal of horizontal marking,
  • Replacement or repair of the damaged motorway furniture – road signs, barriers, acoustic screens, fence road lighting

Contact  us

Intertoll Construction

Gdańsk Office (Intertoll
Construction)
BCB Business Park B1
ul. Azymutalna 9
80-298  Gdańsk, Poland

Phone: +48 58 888 22 17
E-mail: przetargi@intertoll-
construction.pl

 

 

Intertoll Europe

Head Office:

BudaWest building
Rétköz útca 5.
H-1118 Budapest, Hungary

Phone: +36 1 371 0762
Fax: +36 1 215 6165
E-mail:

©2024 Intertoll Construction
Privacy Policy
magnifiercross